[ VI ] LOCATION OF THE PROJECT ON THE ENTSO-E MAP AND ITS COORDINATES

The exploitation has been located on the ENTSO-E map. The location coordinates of various components of the power plant correspond to the following UTM coordinates that are related to the zones indicated below.

  •     –   upper reservoir limits: they correspond to the four vertices of the intersection of the four straight base sides of the perimeter dam:

 

COORDINATES OF THE UPPER RESERVOIR VERTICES.
vertex ED50 system / zone 30  ETRS89 system / zone 31
X Y X Y
1 774.699 4.587.582 272.946 4.585.723
2 773.505 4.590.931 271.986 4.589.147
3 774.835 4.590.951 273.315 4.589.074
4 775.835 4.588.146 274.119 4.586.207

 

  •     –   endpoint of the segment that corresponds to the pipeline axis of the upper reservoir / turbine :

 

WELL AXIS COORDINATE IN THE UPPER RESERVOIR
endpoints

of the axis

ED50 system / zone 30 ETRS89 system / zone 31
X Y X Y
1 775.313 4.588.041 273.591 4.586.139
2 775.518 4.588.475 273.825 4.586.558
  •    

         –   endpoint of the segment that corresponds to the axis of the lower intake in the Segre river according to the alignment with the N-211 road. The coordinates belong to the points of the intersection between the road axis and the endpoints of the  catchment area works:

 

HEADWORKS AXIS COORDINATE IN THE LOWER RESERVOIR

endpoints

of the axis

ED50 system / zone 30 ETRS89 system / zone 31
X Y X Y
1 777.308 4.587.603 275.551 4.585.564
2 777.031 4.587.220 275.248 4.585.200

 

LOCATION OF THE REVERSIBLE PUMPED STORAGE HYDROELECTRIC PLANT  ON THE SEGRE RIVER (TOWNSHIP OF MEQUINENZA-ZARAGOZA-SPAIN)” IN THE ENTSO-E MAP